Monday, May 20, 2024

2024 Trip to the Spring Fling, Day 7

Monday, May 20, 2024 -Ellacoya State Park, Gilford, NH - 37.3 Miles, 454.5 Miles For The Trip

While it was a cool night, it warmed up nicely over the day. By the time we reached Ellacoya State park it was in the 70's, and is still 69°F at 8:00.

Guido dropped his van off at the Laconia Toyota, got an estimate on a couple of repair items, including a sensor that is probably the cause of the dash light problem, but they couldn't get the parts or do the repair for 3 days, too long for our limited time in the area. 

Back at the campground, we spent most of the day sitting around reading under the Scamp awning. The campground is on Lake Winnipesaukee. Anne liked the name of the lake so we are spending a night here.

We are in sites 1 & 2 (me in 2) back in full hookup sites on grass, although the sewer connections are so far back in the site that they are almost impossible to use. $66.50 including a $6.50 reservation fee.

The Guidos in Site 1

Me in Site 2

Dinner was chicken Alfredo & peaches.

Until Tomorrow - 

No comments:

Post a Comment