Tuesday, May 27, 2025

2025 Trip To The Spring Fling, Day 15

Tuesday, May 27, Schodack Island State Park, Schodack Landing, NY - 192.9 Miles, 782.9 Miles For The Trip

We started moving the trailers around at 10:30. First, the Guidos Scamp was spun around so they could hook up to the Sienna and drive down the driveway. The Escape, being larger, was a bit more difficult to spin around, but Dave's tractor did the trick. On the way down the driveway I took out one of my cell antennas. Probably a good thing since I suspect they are not covering many of the new frequencies the cell companies are using. I'll look for a replacement when I get back to Oswego. Dave took a couple of photos of us:

Ready to Go

Me, Jackie, Anne & Guido

An easy drive on the Mass Turnpike & the NY Thruway. We arrived at Schodack a little after 3:00. I', in site 8, the Guidos in site 6. Both are pull throughs with electric only. Mine was far from level - I needed 2" side to side and had to drop the tongue 5", requiring unhooking from the truck. $27.00 per night. We are only here tonight.

The Guidos in Site 6

Me in Site 8

We read for a bit listening to lots of birds & watching the cottonwood fluff floating down on everything.

Dinner was grilled chicken Bubba Burgers for Anne & me and since I only had two burgers, a jalapeno brat for Guido.

Until next time - 

No comments:

Post a Comment